top of page
PAINT PROCESSING BUILD
Industry: Chemical
Location: Chattanooga, TN
Size: 15M
Service: Design-Build
Client in need of additional SWS (Softer Water System) pumps to support semi-conductor fab. Scope includes 3 new softer water pumps with AFD (adjustable frequency drives) and all associated piping/fittings. Backup IW (industrial water) to the existing holding tank and heat trace of all outdoor piping. Cost savings from reduction of piping from original scope approximated to be over $200,000.



bottom of page
