top of page

METALS PARTS CLEANER TOOL INSTALL

Industry: Semi-Conductor
Location: Hillsboro, OR

Size: 2,000 SF
Service: Design-Build

Awarded a contract to provide pipe stress analysis for the piping construction of a cutting-edge pharmaceutical manufacturing facility in North Carolina! Systems analyzed in waste, steam, sanitary, and gases. As well as modeling effects of vessels, pumps, and other equipment for thermal growth affects on the pipes and nozzle loading.

2026-01-31_13h41_27.png
2026-01-31_13h40_54.png
2026-01-31_13h41_48.png
bottom of page